Sky-Pix Aerial Photography

  • Home
  • About
  • Contact
  • Construction Progress Aerials
  • Custom Aerial Photography
  • Stock Aerial Photos
  • Shop Our Galleries
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
  • Image Search
  • Facebook
  • Twitter
x

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
Next
153 images found
twitterlinkedinfacebook

Loading ()...

  • Construction barges for the 520 Bridge Replacement project.
    SR-520_Construction_Barges_130918-05...png
  • Construction of the 555 Tower amid existing high-rises in Downtown Bellevue. On completion, the 555 108th Ave NE project will be the tallest skyscraper in the Bellevue skyline to date.
    555_Tower_Construction_211203-100_St...png
  • Construction of the 555 Tower amid existing high-rises in Downtown Bellevue. On completion, the 555 108th Ave NE project will be the tallest skyscraper in the Bellevue skyline to date.
    555_Tower_Construction_220429-257_St...png
  • Marine construction equipment in Bainbridge Island's Eagle Harbor for the Eagle Harbor Marina dock rebuild.
    Dock_Construction_Barge_Tug_170113-4...png
  • Construction of Sound Transit's Roosevelt Station in Seattle's Roosevelt neighborhood.
    Roosevelt_Station_Construction_16081...png
  • Steel beams, columns, and decking being assembled for a Public Storage under construction along Aurora Ave N in Shoreline, Washington.
    Public_Storage_Steel_Construction_19...png
  • Aerial view of construction activity in the Overlake neighborhood of Redmond, Washington. Visible in this photo are the Sound Transit East Link Extension project, along State Route 520, Esterra Park transit-oriented development in the foreground, and the Microsoft Redmond campus modernization project.
    Overlake_Construction_200731-061_Sto...png
  • Construction site stormwater drainage system.
    Construction_Stormwater_Drainage_190...png
  • Aerial view of the construction activity on the southwest corner of Climate Pledge Arena at Seattle Center.
    ClimatePledgeArena_Construction_2012...png
  • Close-up view of concrete work on one of the upper floors of Nexus condominium tower, under construction on the corner of Howell and Minor, in Seattle's Denny Triangle.
    Nexus_Tower_Concrete_Construction_19...png
  • Construction of new lanes on I-5 near the Tacoma Dome.
    I-5_Construction_170714-038_Stock.png
  • Third and Lenora residential and office tower under construction in Downtown Seattle. The rebar and formwork are set up, ready for the next concrete deck pour.
    Third_Lenora_Construction_190430-329...png
  • Construction activity at Avenue Bellevue, a two-tower, mixed-use condo, hotel, and retail project in downtown Bellevue.
    Avenue_Bellevue_220331-166_Stock.png
  • Construction at the Seattle Expedia Headquarter campus located off of the north end of Elliott Bay in the Interbay neighborhood.
    Expedia_Seattle_HQ_190203-113_Stock.png
  • Construction of the Puget Sound Energy Liquefied Natural Gas facility at the Port of Tacoma.
    Tacoma_LNG_180615-232_Stock.png
  • Construction of the 1120 Denny Way high-rise residential towers project in South Lake Union, between Boren and Fairview Avenue North. Seattle Times Park remains in the northeast corner of the full-block mixed-use development.
    1120_Denny_Way_190430-342_Stock.png
  • Close-up aerial view of an apartment building under construction in Seattle's Yesler Terrace neighborhood, showing staging for the green-roof being installed, and bright-purple debris netting covering the scaffolding on the sides of the building.
    Cypress_120Broadway_180921-078_Stock.png
  • Denny Centre 42-story mixed-use tower under construction in the Denny Triangle neighborhood of Seattle.
    DennyCentre_190218-033_Stock.png
  • Excavation and shoring for a two-tower development at 1001 106th Ave NE, Bellevue, on the former site of an old Cadillac dealership.
    Binary_Towers_Construction_200529-10...png
  • Top-down, vertical aerial of Yesler Terrace Block 5 building sites A and B. Building A is currently under construction in this photo.
    YeslerTerrace_Block-5_Vertical_20061...png
  • Mason And Main, a mid-rise apartment development under construction in Seattle’s Yesler Terrace master-planned community.
    MasonAndMain_210429-169_Stock.png
  • Vertical aerial view looking top-down between two tower cranes, at the wood framing and foundation work at Yesler Terrace Block 5.
    YeslerTerrace_ConstructionActivity_2...png
  • Construction of the Seattle Multimodal Terminal at Colman Dock Project topped out in late February 2021.
    ColmanDock_Top-Out_210301-204_Stock.png
  • A construction crane towers over the shoring and foundation work at the Yesler Terrace Block 5 Building A project.
    YeslerTerrace_Block-5_TowerCrane_200...png
  • Tower cranes in the north end of downtown Seattle's Central Business District. Construction and development growth in Seattle has led to several consecutive years of having the most tower cranes in the nation.
    Seattle_CBD_TowerCranes_171013-179_S...png
  • Capitol Hill transit-oriented mixed-use development under construction. Building A, Buildings B North, and B South, are bounded by 10th Ave E, E John St, and Broadway, with the Sound Transit Capitol Hill Station north entry and Nagle Place Extension in between sites A and B.
    CapitolHill-TOD_Site-A_Site-B_190420...png
  • Construction activity at Yesler Terrace Block 5.
    YeslerTerrace_Block-5_Building_Site_...png
  • Construction activity at the north side of the Seattle Multimodal Terminal at Colman Dock Project.
    ColmanDock_Replacement_North_200227-...jpg
  • Construction activity continues at the Microsoft Redmond campus modernization project.
    Microsoft_Campus_Modernization_20090...png
  • Bellevue 600 Phase 1 substructure construction. Demolition of the Bellevue Corporate Plaza structure has begun for Phase 2 of the project.
    Bellevue_600_Bellevue_Corporate_Plaz...png
  • Aerial view of the construction activity at the Microsoft Headquarters modernization project underway at the Redmond campus. Seven rail-traveling tower cranes are installed at the site of the underground parking facility, which will have four floors of underground parking beneath the rebuilt East Campus, to hold up to 6,500 cars.
    Microsoft_Campus_Modernization_Parki...png
  • Alta Columbia City mixed-use building under construction off of Rainier Avenue South and South Alaska Street in Seattle.
    Alta_Columbia_City_210315-070_Stock.png
  • Deep excavation for the construction of The Artise, a Class-A office tower being built along NE 8th Street in downtown Bellevue.
    Artise_Deep_Excavation_211203-116_St...png
  • Construction of the underground parking garage at the Microsoft Redmond Campus.
    Microsoft_Campus_Underground_Parking...png
  • Multi-family residential development under construction just north of Alderwood Mall. The Lynnwood Place Phase 2 mixed use apartment complex is adjacent to the future site of a new Home Depot, and immediately southwest of the Costco that anchors Phase One of the project site.
    Lynnwood_Place_Phase_2_200314-065_St...png
  • Excavation and shoring site work at Modera Broadway, with construction underway at Capitol Hill TOD Building C, between Cal Anderson Park and Broadway in Seattle's Capitol Hill neighborhood.
    CapitolHill-TOD_Site-C_Modera Broadw...png
  • Steel framing and metal decking of the Washington State Convention Center Expansion Project under construction in Downtown Seattle.
    WSCC_Addition_Steel_200616-089_Stock.png
  • 1200 Stewart, 48-story residential towers under construction in Seattle’s Denny Triangle Urban Center Village.
    1200_Stewart_190614-111_Stock.png
  • Construction activity at the Microsoft Redmond campus modernization project.
    Microsoft_Redmond_Campus_220128-045_...png
  • Top-down (vertical) aerial view of the Rainier Square project under construction in downtown Seattle.
    Rainier_Square_Vertical_200529-138_S...png
  • Aerial view of the construction activity at the Microsoft Headquarters modernization project underway at the Redmond campus. Seven rail-traveling tower cranes are installed at the site of the underground parking facility, which will have four floors of underground parking beneath the rebuilt East Campus, to hold up to 6,500 cars.
    Microsoft_Campus_Modernization_Parki...png
  • Sound Transit's U District Station under construction, along Brooklyn Avenue, as part of the Northgate Link Extension project.
    U-District_Station_190221-136_Stock.png
  • Construction activity at the north side of the Seattle Multimodal Terminal at Colman Dock Project.
    ColmanDock_Replacement_North_200227-...png
  • Steel framing and metal decking of the Washington State Convention Center Expansion Project under construction in Downtown Seattle.
    WSCC_Addition_Steel_200616-103_Stock.png
  • Sound Transit Operations and Maintenance Facility East under construction in Bellevue's Wilburton neighborhood.
    SoundTransit_OMF_East_190415-189_Sto...png
  • Close-up view of a concrete pour on top of a high-rise tower under construction in Downtown Seattle.
    High-Rise_Concrete_Pour_190430-308_S...png
  • Construction activity continues at the Microsoft Redmond campus modernization project.
    Microsoft_Campus_Modernization_20090...png
  • Sound Transit's Spring District 120th Station and trench wall construction in East Bellevue's Spring District neighborhood between 120th and 124th Ave NE.
    120th_Station-SpringDistrict_190415-...png
  • Close-up aerial view of the construction activity at the Microsoft Redmond Campus modernization project's underground parking facility. Two rail traveling tower cranes, and two tower concrete placing pumps ae visible in this photo. The lattice boom of an MEC 2250 crawler crane stretches across the frame in the foreground.
    Rail_Traveling_Tower_Cranes_200731-0...png
  • Aerial view of the construction activity at the Microsoft Headquarters modernization project underway at the Redmond campus. Seven rail-traveling tower cranes are installed at the site of the underground parking facility, which will have four floors of underground parking beneath the rebuilt East Campus, to hold up to 6,500 cars.
    Microsoft_Campus_Modernization_Parki...png
  • Paceline Apartments under construction, off of Aurora Avenue North, in Shoreline, Washington.
    Paceline_Apartments_200209-017_Stock.png
  • Seattle Multimodal Terminal at Colman Dock Project construction.
    Colman_Dock_Project_190415-012_Stock.png
  • Yesler Family Housing and Tapestry mixed-use developments under construction in the Yesler Terrace area of Seattle's Central District. The two projects are being constructed on the same block, with Yesler Family Housing in the foreground along 13th Ave, and Tapestry along 12th Ave.
    YeslerFamilyHousing_TapestryMixed-Us...png
  • A construction tower crane being erected at the site of the Porch + Park mixed-use project in downtown Redmond.
    Redmond_MixedUse_TowerCraneErection_...png
  • Construction of the lightrail tunnels at Sound Transit's Bellevue Downtown Station, off of NE 6th St between 110th and 112th Ave NE, adjacent to Bellevue City Hall.
    Downtown_Bellevue_Station_190203-054...png
  • LIHI Othello Park Apartments under construction off of 43rd Ave S and S Webster St, in south Seattle's Brighton neighborhood.
    Othello_Park_Apartments_201015-096_S...png
  • The Spheres under construction at the Amazon headquarters campus in Seattle's Denny Triangle neighborhood. The three glass domes share the block bounded by 6th and 7th Avenues, from Lenora Street to Blanchard, and shares the block with Amazon Tower II, formally named Day 1.
    Amazon_Spheres_160520-033_Stock.png
  • Ferries arriving from Bainbridge Island and Bremerton to Seattle's Colman Dock while under construction.
    Ferries_ColmanDock_190415-010_Stock.png
  • Overhead aerial view of construction activity for the Washington State Convention Center Expansion Project.
    WSCC_Addition_190420-063_Stock.png
  • Sound Transit Shoreline North/185th Station under construction, on the east side of Interstate 5 and north of Northeast 185th Street.
    Shoreline_North_185th_Station_210831...png
  • The Spheres under construction at the Amazon headquarters campus in Seattle's Denny Triangle neighborhood. The three glass domes share the block bounded by 6th and 7th Avenues, from Lenora Street to Blanchard, and shares the block with Amazon Tower II, formally named Day 1.
    Amazon_Spheres_160520-032_Stock.png
  • Land grading and site development for the construction of a senior independent and assisted living building, as well as a memory care facility off of Clear Creek Rd NW, just north of The Trails at Silverdale development.
    Fieldstone_Senior_Living_Silverdale_...png
  • Sound Transit Eastlink light rail line under construction from Spring District 120th Station, east to Bel-Red 130th Station, and on to 136th Place NE, in the Bellevue-Redmond corridor.
    Eastlink_Bel-Red_Line_191001-027_Sto...png
  • Section of light rail construction connecting along 112th Ave SE at SE 15th Street.
    SoundTransit_SouthBellevue_190415-24...png
  • Close-up aerial view of The Eight, office development project under construction at NE 8th and 108th, in downtown Bellevue. The site of another office tower, The Artise, is in the foreground.
    The_Eight_Office_Tower_220429-252_St...png
  • Sound Transit Shoreline North/185th Station under construction, on the east side of Interstate 5 and north of Northeast 185th Street.
    El_Camion_Demolition_210831-199_Stoc...png
  • Alta Columbia City 7-story mixed use building under construction at the southeast corner at Rainier and South Alaska Street, in Seattle's Columbia City neighborhood.
    Alta_Columbia_City_200629-140_Stock.png
  • Construction of East McKinley Way/East D Street overpass, and new lanes on Interstate 5 in Tacoma.
    E_McKinley_Way-East_D_Street_Overpas...png
  • Construction, excavation, and shoring activity at the Washington State Convention Center Expansion project in Downtown Seattle.
    WSCC_Addition_190813-046_Stock.png
  • Aerial view of the Rainier Square mixed-use tower under construction in downtown Seattle, looking out to Elliott Bay.
    RainierSquare_190813-038_Stock.png
  • The Spheres under construction at the Amazon headquarters campus in Seattle's Denny Triangle neighborhood. The three glass domes share the block bounded by 6th and 7th Avenues, from Lenora Street to Blanchard, and shares the block with Amazon Tower II, formally named Day 1.
    Amazon_Spheres_160513-220_Stock.png
  • Sound Transit East Link train bridge under construction over I-405.
    405_Rail_Bridge_190415-203_Stock.png
  • Mixed-use apartment project under construction in Seattle's Little Saigon neighborhood.
    Mixed-Use_Apartment_190531-165_Stock.png
  • Elliott Bay Seawall Project under construction along Seattle's waterfront.
    Seattle_waterfront_160714-210_stock.png
  • Yesler Towers apartment building under construction at the corner of S Washington St and Yesler Way.
    Yesler_Towers_220531-177_Stock.png
  • Aerial View with 555 Tower construction in the foreground looking SW to Bellevue Downtown Park, and Whalers Cove.
    555_Tower_DowntownBellevue_220429-23...png
  • Sunset Terrace Apartments under construction next to the Renton Highlands Library.
    Renton_Sunset_Terrace_210415-100_Sto...png
  • Offset vertical aerial view of Rainier Square in downtown Seattle. The original Rainier Tower was completed in 1977, the new Rainier Square Tower topped out in 2020. At he time of this photo, the 10-story 400 University office tower is still under construction.
    Rainier_Square_Towers_200414-050_Sto...png
  • Bellevue 1001 Office Towers under construction off of NE 10th Street, between 106th Ave NE and NE Bellevue Way.
    BinaryTowers_210106-088_Stock.png
  • Ferries arriving from Bainbridge Island and Bremerton to Seattle's Colman Dock while under construction.
    Ferries_ColmanDock_190415-007_Stock.png
  • Sound Transit link light rail under construction in the Bellevue-Redmond corridor.
    Bel-Red_EastLinkExtension_190415-181...png
  • Seattle waterfront with the ferry terminal replacement project under construction, and the demolition of the Alaskan Way Viaduct.
    Ferries_ColmanDock_190415-005_Stock.png
  • Washington State Convention Center Expansion project in Downtown Seattle. The site is bounded by Pine and Howell Streets, and 9th and Boren Avenues. Olive Way is temporarily rerouted during construction and will be returned to its original location.
    WSCC_Addition_190218-038_Stock.png
  • Steep oblique aerial view of the Judge Patricia H. Clark Children and Family Justice Center under construction, on the block bounded by 12th and 14th avenues, East Remington Court and East Spruce Street, in Seattle's Squire Park neighborhood.
    Family_Justice_Center_201121-123_Sto...png
  • Overlake Medical Center inpatient tower under construction as part of the three-phase Project FutureCare campus expansion, on the corner of NE 10th St and 116th Ave NE in Bellevue.
    OverlakeMedicalCenter_ProjectFutureC...png
  • The Spheres under construction at the Amazon headquarters campus in Seattle's Denny Triangle neighborhood. The three glass domes share the block bounded by 6th and 7th Avenues, from Lenora Street to Blanchard, and shares the block with Amazon Tower II, formally named Day 1.
    Amazon_Spheres_160513-224_Stock.png
  • The Spheres under construction at the Amazon headquarters campus in Seattle's Denny Triangle neighborhood. The three glass domes share the block bounded by 6th and 7th Avenues, from Lenora Street to Blanchard, and shares the block with Amazon Tower II, formally named Day 1.
    Amazon_Spheres_160520-040_Stock.png
  • Excavation and shoring equipment on site for the construction of Orenda Apartments, part of the Othello Square development in Seattle's Rainier Valley neighborhood.
    OrendaApartments_191129-190_Stock.png
  • Vertical aerial view of the construction activity at the Washington State Convention Center Expansion project in Downtown Seattle.
    WSCC_Addition_191114-008_Stock.png
  • 2+U office tower under construction at 2nd and University in Downtown Seattle, Washington.
    2andU_190503-022_Stock.png
  • Construction of the Sound Transit NE 40th Street Overlake Transit Center, between SR-520 and 156th Ave NE, at the Microsoft Campus in Redmond, Washington.
    Overlake_Transit_Center_190430-404_S...png
  • Structural steel of the Amazon Apollo office building under construction in Seattle's South Lake Union neighborhood.
    325_9th_Ave_N_140730-068_Stock.png
  • SR 99 tunnel north portal site; SR 99 Tunnel Project North SR 99 Tunnel Project North Portal and Operations Building under construction at the corner of 6th Ave N and Harrison St in Seattle.
    SR99_North Portal_FoundationPit_1407...png
  • Steep oblique aerial view of the wood framing construction for LIHI Othello Park Apartments in south Seattle's Brighton neighborhood.
    LIHI_Othello_Park Apartments_200929-...png
  • A K1800 tower crane over Sound Transist's Roosevelt Station construction site. The massive horizontal-jib crane became know as "Big Red" by the community.
    Big_Red_Tower_Crane_190221-127_Stock.png
  • The Spheres under construction at the Amazon headquarters campus in Seattle's Denny Triangle neighborhood. The three glass domes share the block bounded by 6th and 7th Avenues, from Lenora Street to Blanchard, and shares the block with Amazon Tower II, formally named Day 1.
    Amazon_Spheres_160513-214_Stock.png
  • Overlake Medical Center inpatient tower under construction as part of the Project FutureCare campus expansion, on the corner of NE 10th St and 116th Ave NE in Bellevue.
    OverlakeMedicalCenter_ProjectFutureC...png
  • Sound Transit Operations and Maintenance Facility East under construction along 120th Ave NE, in Bellevue's Wilburton neighborhood.
    SoundTransit_OMFE_190701-051_Stock.png
  • Ovation residential towers under construction next to the Town Hall Seattle renovation project, on the western edge of Seattle's First Hill neighborhood, between Spring and Seneca Streets.
    Seattle_Town_Hall_Block_190315-246_S...png
  • An American flag waives off the tower crane above the job site at Block 5, Building A, in Yesler Terrace. An active concrete pour is happening below.
    YeslerTerrace_Block-5_ConcretePour_2...png
Next